Sunday, February 12, 2012

The First day of WWW

Today we went to visit the working places sites. There were two schools which needed to be repaired and renewed. Therefore our class was divided into 2 parts, these were merely grade 11.1 and grade 11.2. There is a lot of work required in order to make everything look good. The first school was the place where I had to work. My job is to engage with the children and play with them. Although i am going to help with everything as it is one of my goals. I am going to do the following things: -
1) Landscaping - (Remove all the stones from the playground area of where the children play make the play ground a better place).
2) Make painting (Murals) on the out side walls so that the school looks more colorful and it is better for the children.
3) Paint the insides of the schools.
4) Make a tree house.
5) Engage with the children and interact with them.

All I could say that day was, "Get prepared, a lot of work is needed!".

No comments:

Post a Comment